The service report is the only thing left after a maintenance visit. The work may be flawless, but if the report says "unit checked, all OK", nobody can tell what was done, compare it with the next visit or defend it against a complaint. A good report answers, without anyone having to call the technician: which unit, what was found, what was measured, what was done, what's still pending and who received it.

This guide works for any line of business: an HVAC contractor, a building's maintenance team, a plant or a hospital. At the end you'll see how it's done in Qribo.

1. Identify the unit unambiguously

A report about "the pump" is useless if there are three pumps. The header should identify the unit so anyone can find it:

  • Equipment code (the one on its label) and a short name.
  • Type, make, model and serial number.
  • Site and exact location: building, floor, room.
  • Client and contact, if you service third parties.
  • Date and time of start and finish, and who did the work.
  • Type of work: preventive, corrective (breakdown), inspection or installation.

If the unit has a QR label, scanning it on arrival avoids transcription errors: the report is linked to the right unit from the start.

2. Findings: how you found the unit

Before touching anything, describe its initial condition. This is what protects you if a problem that was already there shows up later:

  • Overall condition (working, with faults, out of service).
  • What the user or client reported, in their words.
  • What you observed: noises, leaks, corrosion, active alarms, dirt.
  • A photo of the initial condition of whatever you're going to work on.

Write facts, not conclusions: "oil leak at the cover gasket" is useful; "unit in poor condition" isn't.

3. Measurements, always with their range

A measurement without a reference says nothing. "Pressure 58 psi" only means something if the report also says what the normal range is for that unit. For each measurement:

  • Value and unit (°C, psi, A, V, bar…).
  • Normal range according to the manufacturer or your own criteria, written in the template, not left to the technician's memory.
  • What you did if the value was out of range.

Measuring the same thing at the same point every time lets you see the trend between visits: a pressure that drops a little every month announces the next breakdown long before it happens.

4. Photos that prove something

Photos are the evidence the client looks at first. To be useful:

  • Before and after each intervention, from the same angle.
  • The unit's nameplate if it isn't on record yet.
  • Close-ups of what was repaired or replaced (the dirty filter, the damaged part, the tightened connection).
  • Taken on the spot, from the camera. A photo picked from the gallery later doesn't prove it's from that visit.

A few well-chosen photos are worth more than twenty identical ones.

5. Actions taken

List what you did, in order and with concrete verbs: "cleaned the coil", "replaced the start capacitor", "tightened the panel connections". If you followed a checklist, the report should show each point with its result, not just "checklist complete".

For a breakdown, add the diagnosis: what failed (the failure mode), why (the probable cause) and which part. Over time, this is what tells you which units keep failing for the same reason.

6. Parts: used and pending

  • Used: which part, how many and, if applicable, its code.
  • Pending: what's needed to get the unit fully back in shape, with a photo that justifies it. A pending part that only lives in the technician's chat gets forgotten; in the report it becomes a follow-up.

7. Final condition and recommendations

Close with how the unit was left (repaired, replaced, needs another intervention, out of service) and recommendations for the next visit. If you recommend a replacement, back it up with the history: "third compressor failure in six months" is more convincing than "replacing the unit is recommended".

8. The signature of whoever receives the work

The signature turns the report into a record both parties have accepted. It should include name, role, date and time. Signing on paper and scanning it later works, but paper gets lost; signing on screen when the work is finished is the most practical option.

What if nobody is there to sign? Record why (nobody on site, the manager had left) and send the report so they can sign it later from their email. A report with neither a signature nor an explanation invites complaints.

9. Delivery: fast, branded and with proof

A report that arrives a week later no longer matters to anyone. Ideally:

  • A PDF with your company's logo and details that can be forwarded and filed.
  • Sent to the right people (the site manager, the client's contact) as soon as it's approved.
  • With proof of sending: if the client says it never arrived, you can check whether the email was delivered or bounced.
  • Stored in the unit's history, so the next visit starts where this one ended.

Checklist for reviewing your report template

BlockThe minimum
UnitCode, type, make, model, serial, site and location
WorkType of work, date and time, technician
FindingsInitial condition and photo
MeasurementsValue, unit and normal range
ActionsConcrete list; for breakdowns, failure, cause and part
PartsUsed and pending (with photo)
Wrap-upFinal condition and recommendations
SignatureName, role, date and time of whoever receives the work
DeliveryPDF sent to the contacts, with proof

How it's done in Qribo

In Qribo the report is built on the spot, from the phone, and goes out on its own:

  • Templates per type of work. You define the fields once: text, number with unit and normal range, options, yes/no, date, photo, signature, GPS location and part request. The technician goes through the template section by section.
  • The unit already identified. The technician scans the QR label and the report is linked to the asset, with its details.
  • Photos from the camera, before and after. They upload in the background: the technician can complete the task while they're still uploading.
  • Measurements with a range: a reading outside the normal range opens a breakdown automatically, and the asset's record shows the trend of each measurement.
  • Breakdown diagnosis when completing it: failure type, probable cause and part.
  • AI dictation (from the Pro plan): the technician speaks and reviews the text before adding it; the audio isn't stored.
  • On-screen signature from whoever receives the work, with their name and role. If they're not there, the app sends a link to sign from their email (valid for 7 days) or the report waits for your company's review.
  • A PDF with your letterhead, sent on approval to the site's and the client's contacts —right away or in a daily or weekly digest— with each email's delivery status on the report page. The client can also find it in their portal.

You can try it free for 14 days, no card, with a template for your own work.

Try it with your own equipment

14 days free, no card required. Label an asset, schedule a round and see the report your client receives.